Gate - Thus the JSDF Fought There! Wiki
Advertisement
MV-22 Osprey

MV-22 Osprey

The Bell Boeing V-22 Osprey is an American multi-mission, tiltrotor military aircraft with both vertical takeoff and landing (VTOL), and short takeoff and landing (STOL) capabilities. It is designed to combine the functionality of a conventional helicopter with the long-range, high-speed cruise performance of a turboprop aircraft.

The failure of Operation Eagle Claw during the Iran hostage crisis in 1980 underscored the requirement for a new long-range, high-speed, vertical-takeoff aircraft for the United States Department of Defense. In response, the Joint-service Vertical take-off/landing Experimental (JVX) aircraft program started in 1981. A partnership between Bell Helicopter and Boeing Helicopters was awarded a development contract in 1983 for the V-22 tiltrotor aircraft. The Bell Boeing team jointly produce the aircraft. The V-22 first flew in 1989, and began flight testing and design alterations; the complexity and difficulties of being the first tiltrotor for military service led to many years of development.

The United States Marine Corps began crew training for the MV-22B Osprey in 2000, and fielded it in 2007; it supplemented and then replaced their Boeing Vertol CH-46 Sea Knights. The U.S. Air Force fielded their version of the tiltrotor, CV-22B, in 2009. Since entering service with the U.S. Marine Corps and Air Force, the Osprey has been deployed in transportation and medevac operations over Iraq, Afghanistan, Libya, and Kuwait. The U.S. Navy plan to use the CMV-22B for carrier onboard delivery (COD) duties beginning in 2021.

History[]

The failure of the Iran hostage rescue mission in 1980 demonstrated to the United States military a need for "a new type of aircraft, that could not only take off and land vertically but also could carry combat troops, and do so at speed." The U.S. Department of Defense began the Joint-service Vertical take-off/landing Experimental (JVX) aircraft program in 1981, under U.S. Army leadership.

The defining mission of the U.S Marine Corps (USMC) has been to perform an amphibious landing; the service quickly became interested in the JVX program. Recognizing that a concentrated force was vulnerable to a single nuclear weapon, airborne solutions with good speed and range allowed for rapid dispersal, and their CH-46s were wearing out. Without replacement, the USMC and the Army merging was a lingering threat, akin to President Truman's proposal following World War II. The OSD and Navy administration opposed the tiltrotor project, but congressional pressure proved persuasive.

The Navy and USMC were given the lead in 1983. The JVX combined requirements from the USMC, USAF, Army and Navy. A request for proposals (RFP) was issued in December 1982 for preliminary design work. Interest was expressed by Aérospatiale, Bell Helicopter, Boeing Vertol, Grumman, Lockheed, and Westland. Contractors were encouraged to form teams. Bell partnered with Boeing Vertol to submit a proposal for an enlarged version of the Bell XV-15 prototype on 17 February 1983. Being the only proposal received, a preliminary design contract was awarded on 26 April 1983.

The JVX aircraft was designated V-22 Osprey on 15 January 1985; by that March, the first six prototypes were being produced, and Boeing Vertol was expanded to handle the workload. Work was split evenly between Bell and Boeing. Bell Helicopter manufactures and integrates the wing, nacelles, rotors, drive system, tail surfaces, and aft ramp, as well as integrates the Rolls-Royce engines and performs final assembly. Boeing Helicopters manufactures and integrates the fuselage, cockpit, avionics, and flight controls. The USMC variant received the MV-22 designation and the USAF variant received CV-22; this was reversed from normal procedure to prevent USMC Ospreys from having a conflicting designation with aircraft carriers (CV). Full-scale development began in 1986. On 3 May 1986, Bell Boeing was awarded a $1.714 billion contract for the V-22 by the U.S. Navy. At this point, all four U.S. military services had acquisition plans for the V-22.

The first V-22 was publicly rolled out in May 1988. The project soon suffered several blows. That year, the U.S. Army left the program, citing a need to focus its budget on more immediate aviation programs. In 1989, the V-22 survived two separate Senate votes that could have resulted in cancellation. Despite the Senate's decision, the Department of Defense instructed the Navy not to spend more money on the V-22. When the projected development budget greatly increased in 1988, Defense Secretary Dick Cheney tried to defund it from 1989 to 1992 in order to cancel it. He was overruled by Congress, which provided unrequested program funding. Multiple studies of alternatives found the V-22 provided more capability and effectiveness with similar operating costs. The Clinton Administration was supportive of the V-22, helping it attain funding.

Advertisement